Please note that Lumberock Marine Grade Decking claims no liability or responsibility for the improper installation of our product. All installations are unique and it is the sole responsibility of the installer to determine specific requirements in regard to each application. We recommend that all designs be reviewed by a licensed architect, engineer or local building official before installation.
Measure the exact distance between each set of posts and cut the 2×4 Top Spindle Support, the 2×4 Bottom Spindle Support and the 2×6 Top Rail accordingly. Use the thirteen (13) 2x2s as the Railing Spindles and space them evenly between the post sleeves. Cut the remaining 2x2s into two 3.5″ Support Blocks.
Measure the exact distance between each set of posts and cut the 2×4 Top Spindle Support, the 2×4 Bottom Spindle Support and the 2×6 Top Rail accordingly. Use the thirteen (13) 2x2s as the Railing Spindles and space them evenly between the post sleeves. Cut the remaining 2x2s into two 3.5″ Support Blocks.
Center and attach the two (2) Support Blocks under the 2×4 Bottom Spindle Support as shown on the Railing Installation Instructions (shown above – or click here).
Make sure you center the Top Rail to the Top Spindle Support board.